There had been multiple eventualities while it comes to SAP (ECC) ERP migration to SAP S/4 HANA. It is crucial to apprehending clients contemporary panorama and used functionalities and modules within the modern-day SAP landscape/gadget to decide the proper S/four HANA migration scenario.
Determination of migration scenario is so vital that based totally in this understanding only scope, group length and project valuation (bidding price) may be determined. For instance, there might be a couple of phases (sub-initiatives) in a single simple e.G. ECC6, EhP7 migration to S/four HANA 1709.
Identification of suitable migration situation could help you finalizing the following things:
The significance of Work (Scope)
Number of Project Phases
Team Size Requirement
Project Amount (Bid Amount)
Mainly this article is for the income crew involved in approaching clients for SAP migration. I desire it facilitates them.
Note: This article is in particular for SAP specialists/management who are market goers. Please get your basics strong before committing something approximately S/4HANA Migration.
In this text, we would be focussing on Scenario 6 and Scenario 7. Other Scenarios might be protected in future articles.
Note: This document is ready considering that first, the migration will take place from ECC surroundings and required extra capacity would be activated within the migrated S/four HANA 1709 environment. With this, your patron could be for your hand.
SAP S/4 HANA Migration
In this text, we would be focussing on Scenario 6 and Scenario 7. Other Scenarios might be protected in future articles.
Note: This document is ready considering that first, the migration will take place from ECC surroundings and required extra capability would be activated within the migrated S/four HANA 1709 environment. With this, your patron could be for your hand.
SAP ERP to S/4 HANA Migration
Note: A new state of affairs has been advanced in S/four HANA 1709 for clients who are already in SAP ERP with HANA1 (Suite on HANA) or S/four HANA with HANA1 (S/4 HANA Finance 1503, 1605 and S/four HANA 1511, 1610) and want emigrate to S/4 HANA 1709 (that’s on HANA2). Migration needs to be done in levels:
Phase1: SAP ERP SAP HANA (Suite on HANA) to SAP ERP HANA2 (Suite on HANA2)
Phase2: S/4 HANA with HANA1 (S/4 HANA Finance 1503, 1605 and S/four HANA 1511, 1610) to S/4 HANA 1709 (1709 is on HANA2)
S/4 HANA Migration Concepts (Doc. Splitting and Parallel Ledger/Accounting/HANA2)
Following factors help you figuring out migration situation in appreciate to situation 6 and scenario 7:
There is not any concept of ‘New GL or ‘Classic GL’ in S/four HANA
New GL isn’t always a pre-perquisite for migrating to S/four HANA, you can migrate to S/four HANA from traditional GL
Migration from Classic GL to S/four HANA 1610 (1503, 1511, 1605 and 1610) turned into possible, however, sooner or later, record splitting was no longer feasible and due to this SAP advice was to prompt first New GL (Ledger introduction and report splitting) and then migrate to S/4 HANA
Migration from Classic GL (without activating to New GL) to S/four HANA 1709 is possible, additionally, now subsequent document splitting and ledger introduction is viable in S/4 HANA 1709. This is the reason, now there’s no need of doing a project for New GL activation in ECC environment.
Need to understand that there is probably possible 3 separate initiatives for converting ECC on classic GL to S/four HANA with document splitting and parallel accounting (additional ledgers).
Subsequent Ledger (Parallel Accounting) introduction changed into feasible from SAP S/four HANA Finance SAP 1605 and S/four HANA 1610.
A new state of affairs has been evolved in S/four HANA 1709 for customers who’re already in SAP ERP with HANA1 (Suite on HANA) or S/four HANA with HANA1 (S/4 HANA Finance 1503, 1605 and S/four HANA 1511, 1610) and need migrate to S/4 HANA 1709 (that is on HANA2). Migration needs to be achieved on two levels:
Project Phases for Migrating SAP ECC System to S/4 HANA 1709
Considering there is one SAP ECC consumer with classic GLs and he wants to circulate to S/4 HANA 1709. He additionally desires to have functionality such as report splitting and parallel accounting (extra ledgers).
Phase 1: ECC Migration to S/four HANA
a. Preparatory Phase
System Requirement (Unicode Conversion)
Maintenance Planner
Pre-checks
Custom Code Pre-Parathion
b. Technical Migration (SUM)
Database Migration
Software Upgrade
Data Conversion
c. Delta Customization
d. Data (Functional) Migration (Migration Cockpit)
e. Testing
f. Go-Live
Phase2: Activation of Parallel Ledger (Non-Leading Ledger Introduction)
SAP has two approaches to meet multi GAAP reporting requirements i.e. the accounting approach and the ledger approach
- Preparatory Phase
- Execution Phase
- Post – Processing Phase
Phase3: Activation of Document Splitting
- Preparatory Phase
- Execution Phase
- Post – Processing Phase
(Further detailing may be acquired from this weblog https://dynamoinfotech.com/
Note: No SLO carrier is required for activating report splitting in the end. Standard record splitting activation cockpit is available in IMG node in S/4 HANA 1709.
Major/Select Changes in S/four HANA 1709
If you’re going to the patron for sales pitch earlier than that please get the expertise of ‘what’s new in S/4 HANA 1709’.
New HANA Data Base i.E. HANA 2 DB
Machine Learning competencies on S/4 HANA 1709 On-Premise
Expanding Core with Embedded
Innovation on Core: Demand-Driven Replacement, Advanced Variant Configuration, Real-Time Inventory Management (e.G. Oil & Gas)
New S/four HANA Migration Cockpit
A new addition to SAP Fiori Lot